FHIR © HL7.org  |  FHIRsmith 4.0.1  |  Server Home  |  XIG Home  |  XIG Stats  | 

FHIR IG analytics

Packagehl7.terminology.r3
Resource TypeCodeSystem
IdCodeSystem-v2-0472.json
FHIR VersionR3

Resources that use this resource

No resources found


Resources that this resource uses

No resources found


Narrative

Note: links and images are rebased to the (stated) source

Generated Narrative: CodeSystem v2-0472

Language: en

Properties

This code system defines the following properties for its concepts

NameCodeURITypeDescription
Statusstatushttp://hl7.org/fhir/concept-properties#statuscodeA code that indicates the status of the concept
deprecatedv2-table-deprecatedhttp://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-table-deprecatedcodeVersion of HL7 in which the code was deprecated
V2 Concept Commentv2-concCommenthttp://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentstringV2 Concept Comment
V2 Concept Comment As Publishedv2-concCommentAsPubhttp://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentAsPubstringV2 Concept Comment As Published

Concepts

This case-sensitive code system http://terminology.hl7.org/CodeSystem/v2-0472 defines the following codes in a Is-A hierarchy:

CodeDisplayDefinitionStatusV2 Concept CommentV2 Concept Comment As Published
S SynchronousSynchronousactiveDo the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.
A AsynchronousAsynchronousactiveDo the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.
C Actuation TimeActuation TimeactiveIt will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).

Source1

{
  "resourceType": "CodeSystem",
  "id": "v2-0472",
  "language": "en",
  "text": {
    "status": "generated",
    "div": "<!-- snip (see above) -->"
  },
  "extension": [
    {
      "url": "http://hl7.org/fhir/StructureDefinition/structuredefinition-wg",
      "valueCode": "oo"
    }
  ],
  "url": "http://terminology.hl7.org/CodeSystem/v2-0472",
  "identifier": {
    "system": "urn:ietf:rfc:3986",
    "value": "urn:oid:2.16.840.1.113883.18.300"
  },
  "version": "3.0.0",
  "name": "TqConjunctionId",
  "title": "tqConjunctionId",
  "status": "active",
  "experimental": false,
  "date": "2019-12-01",
  "publisher": "Health Level Seven International",
  "contact": [
    {
      "telecom": [
        {
          "system": "url",
          "value": "http://hl7.org"
        },
        {
          "system": "email",
          "value": "hq@HL7.org"
        }
      ]
    }
  ],
  "description": "HL7-defined code system of concepts specifying that a second timing specification is to follow using the repeat delimiter.  Used in HL7 Version 2.x messaging in the TQ1 segment.",
  "purpose": "Underlying Master Code System for V2 table 0472 (TQ Conjunction ID)",
  "copyright": "This material derives from the HL7 Terminology (THO). THO is copyright ©1989+ Health Level Seven International and is made available under the CC0 designation. For more licensing information see: https://terminology.hl7.org/license.html",
  "caseSensitive": true,
  "valueSet": "http://terminology.hl7.org/ValueSet/v2-0472",
  "hierarchyMeaning": "is-a",
  "compositional": false,
  "versionNeeded": false,
  "content": "complete",
  "property": [
    {
      "code": "status",
      "uri": "http://hl7.org/fhir/concept-properties#status",
      "description": "A code that indicates the status of the concept",
      "type": "code"
    },
    {
      "code": "v2-table-deprecated",
      "uri": "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-table-deprecated",
      "description": "Version of HL7 in which the code was deprecated",
      "type": "code"
    },
    {
      "code": "v2-concComment",
      "uri": "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concComment",
      "description": "V2 Concept Comment",
      "type": "string"
    },
    {
      "code": "v2-concCommentAsPub",
      "uri": "http://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentAsPub",
      "description": "V2 Concept Comment As Published",
      "type": "string"
    }
  ],
  "concept": [
    {
      "id": "4869",
      "code": "S",
      "display": "Synchronous",
      "definition": "Synchronous",
      "property": [
        {
          "code": "v2-concComment",
          "valueString": "Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An \"S\" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day."
        },
        {
          "code": "v2-concCommentAsPub",
          "valueString": "Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An \"S\" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day."
        },
        {
          "code": "status",
          "valueCode": "active"
        }
      ]
    },
    {
      "id": "4870",
      "code": "A",
      "display": "Asynchronous",
      "definition": "Asynchronous",
      "property": [
        {
          "code": "v2-concComment",
          "valueString": "Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time).  The conjunction of \"A\" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday."
        },
        {
          "code": "v2-concCommentAsPub",
          "valueString": "Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time).  The conjunction of \"A\" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday."
        },
        {
          "code": "status",
          "valueCode": "active"
        }
      ]
    },
    {
      "id": "4871",
      "code": "C",
      "display": "Actuation Time",
      "definition": "Actuation Time",
      "property": [
        {
          "code": "v2-concComment",
          "valueString": "It will be followed by a completion time for the service.  This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported)."
        },
        {
          "code": "v2-concCommentAsPub",
          "valueString": "It will be followed by a completion time for the service.  This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported)."
        },
        {
          "code": "status",
          "valueCode": "active"
        }
      ]
    }
  ]
}